Start With Dependencies, Not Target Instance Sizes
Cloud migration schedules slip most often when network dependencies, scheduled batch jobs, and stateful database locks are discovered mid-cutover rather than mapped up front.
Build the Landing Zone via Code Before Moving Traffic
Establish IAM boundaries, VPC segmentation, loopback database policies, TLS termination, and centralized log capture as repeatable Infrastructure-as-Code modules.
- Inventory application-to-database latency requirements prior to choosing multi-region topologies.
- Rehearse database replication and rollback timing in staging under production-like dataset sizes.
- Decommission legacy hosts only after monitoring confirms sustained error-free parity.
Practical Exit Criteria per Migration Wave
Treat each wave as done only when health checks, backup restore drills, and runbook handoffs pass verification.